Ollie said:
I did say well before construction began that you'd all be pretty disappointed and you all had a go at me basically saying "Shut up you don't know anything". Looks like I was right lol.
Also looking back at the last few pages. Don't try to over complicate what happens in the building (reading someone saying it might have a drop and tilt track). It's best just to sit back and watch the construction and take the ride for what it is rather than thinking it's going to be the new Nemesis or something.
Not really Ollie.
Two things. First, to anyone who thought it was a Megalite - they'd be disappointed. To anyone who studied the layout on the plans and believed them to be accurate, what we're getting is what was expected. I am not disappointed as this is exactly what I expected.
Secondly, last week somebody said "I'll put money on it being Intamin" and you said "You'd lose your money".
So you basically really know nothing. Somebody in passing has said that those expecting a new Nemesis or Expedition Ge Force will be disappointed - something that anyone could have told them six months ago. There's always somebody who "has inside information", who then gloats afterwards with "I told you so". It's irritating, especially when 50% of the information the told us was wrong and the other 50% was obvious
Erm, I'm still as excited/unexcited as ever about this. It's still all about the inside bit, which only a few people know about (and NOT Ollie). I'm still expecting a simple show of some kind, and there HAD to be a drop. The train enters the station on one level, and leaves on a lower level.
The track has to come down a fair way in a short distance - so a drop is the most obvious choice. I can't see it being much more than a fast lift down though.