Dave said:
Don't be daft. The ride will start construction in October/November, as the tower part of the ride is the most difficult section to build because of the complex of the tower structure.
The tower is one of the simplest things to build, its not like it comes in lots of seperate steel bars that need to be bolted together, the whole structure is welded:
And is made up of 2-3 sections since you can put 75ft easily on the back of a low loaded, and this makes it quite simple to assemble, where they can either assemble it on the ground and lift it vertically, or assemble it peice by peice.
The tower could be completed in about 1/2 a day.
Here you can see that the tower is fully constructed, and then split into sections to ship it to the park.
Vertical construction is unlikely to start yet, Speed took around 4 weeks to get all the supports and track in place. We may see some station track and the pre lift section go in, Since they need to build the theming around that.