What's new

Vekoma testing something new ? (at their testing facility)

I went today on Sunday 2nd Januari 2022 for a quick look. Nothing changed.
Normaly at Vekoma they don't work between Christmas and New Year.

So hopefully next week or so the Tiltsection will arive. Then we know what type of track Vekoma is gonna use for the V2.0 version.
 
Your commitment to documenting and recreating this project is most impressive 👏

I did not expect to have this animation accompanied by Darude’s 2000 super smash, “Sandstorm”. As pleasing as it was, I can’t help but think the DJ Snake & Lil John classic, “Turn Down for What”, would have been more apt.
Hi, yes after seen the video clip i understand
 
Edit : Quick visit at 26th Januari : Preparing installation for cables, sensors and hydraulic-lines :D

Edit : Quick visit at 23th Januari : No changes.

Edit : Quick visit at 20th Januari : No changes.

Edit : Quick visit at 13th Januari : No changes

Edit : Quick visit at 8th Januari. No changes.
 
Last edited:
New images. Its NOT the tilt-section. Its the track part between the last catwalk and the tilt-section (so its in a fixed position on the construction)
(When i'm ready with my model i will place some images of it)


AZV4gRr[1].jpg
btEXWAS[1].jpg

tElzE9F[1].jpg
0Z87TDF[1].jpg
d3kSiTB[1].jpg
(not the yellow crane equipment)
 
Last edited:
I did a quick visit, nothing realy changed. (They installed some pneumatic stuff, tanks and pipes)

I'm working on my NL2 model. I just did an prediction how its possible works (the grabhook at the back of the train)

 
Top