UC said:Blaze said:There are two pieces of track perfectly aligned with each other. as the train reaches the end of the first piece, a catch car attaches to the train and drags it across the gap to join the end piece.
I haven't been following, and I don't especially care about this project, but - are you f*cking kidding me?
Do you think before you post? Or do you just have no concept of safety in design at all?
There is so much wrong with that statement that I wouldn't even know where to begin. I don't care to waste everyone else's (and my own) time on the subject, but if you really want to know what the hell is so wrong with your statement, please, email me.
It has been patented. What I said is exactly what the patent is. Something connected to the track connects to the train and brings it across the gap. Retractable bumpers and brakes make sure it will not over-shoot, then wheels move it forwards, all at the same speed so it appears the train has floated across. Simple.
Anyway, In John Wardley's podcast, he confirms what Alton said in their brochure, that it will open on March 20th and says Merlin want it ready in January.