The stairwell + lift shafts for Tower 1 + 2 of Hotel Charles Lindbergh are now clearly visible over the fence from outside the Rookburgh construction site.
— Christopher Kenny (@cslkenny) July 24, 2019
A very close look (best to focus on the structural pillars between) and you can make out the back of 5 of the hotel rooms. pic.twitter.com/Hyc7vMM2Ur
The assembly of hotel rooms has also started for Tower 3 (located in the middle of all that track).
— Christopher Kenny (@cslkenny) July 24, 2019
About 4 rooms have been built so far, and it appears it will follow the same 5 rooms per floor structure as the other towers. pic.twitter.com/uNCGAH98uu
Further along the 1st Launch work to construct the theming framework continues.
— Christopher Kenny (@cslkenny) July 24, 2019
Looking closely from the Berlin entrance now visible is the frame for this top element (drawbridge to nowhere?😂) of the AirRail structure. pic.twitter.com/k9Sb8SoJZc
I like your imagination, but nope. Intamin make the most powerful launches in the World, I would expect FLY's to be less powerful than Taron's and therefore be physically longer to reach a certain speed.Idea: the launch is very long although the topspeed is expected to be lower as taron because of the sharp, highly banked turns. Does somebody already considered there could be a "missed" launch? You'll roll back into the launch section as you wont reach the top of the first hill and then get launched at higher speed?
Quick update - basically same as before more theming and more hotel stuff...
Don't think they train will be much longer than taron's. Althought due to the turning mechanism I think it will be heavier so more effort is needed to launch to the same speed.
Good point. Would have been Nice tough ?They will be much longer, the stations (just the onload) length is about 28 meters.
They need to be really long as well if they want to have some form of acceptable capacity, with 2 people per row and a lot of space between rows for the turning mechanism. (Just take another look at the Vekoma concept art)
Yup its directly beside. Although that one visible is empty and now owned by the park - the other attached house not visible to the left is still occupied.Thanks for the great pictures! Maybe you should cut out the lower left corner of the first picture for privacy reasons. BTW, I didn't know that the construction site is *so* close to that house...
The Berlin facing facade of the Rookburgh sound barrier continues to take shape. The centre section appears to look like a stone block built wall/building with two wooden gates in it. pic.twitter.com/Lo5Se5CvFC
— Christopher Kenny (@cslkenny) August 1, 2019
As Hotel Charles Lindbergh continues to grow hotel rooms from Tower 1 + 2 are now visible above the fence (each floor has 5 rooms as numbered in the 2nd pic).#Rookburgh pic.twitter.com/ukSsb6EJPR
— Christopher Kenny (@cslkenny) August 1, 2019
View of the back of the rooms. The circular opening presumably for fitting out access, and maybe for an opaque window for natural light into the shower/toilet room? pic.twitter.com/oeCGzp4Twu
— Christopher Kenny (@cslkenny) August 1, 2019
Two, a zero-g roll at the start of the first half and a wingover/corkscrew thing at the end of the second.I have a question about the number of inversions of F.L.Y.
Who can tell me how many inversions F.L.Y. will have ?
You don't have to take my word for it, but I don't care enough to sift through this entire thread to prove something to youI believe it only with images.