JoshC.
Strata Poster
If the ride system is staying the same, I can't imagine staff training being a particularly intensive process. Even within Merlin, the operation of an omnimover with self lowering and raising restraints will be fairly straightforward and not require a significant amount of time for staff to be trained up.
If staff are being trained on something related to the ride now, it's probably being done to ensure as quick and smooth practical training process when the ride is ready. That will mean there's a speedy turnover from ride being ready to opening.
If staff are being trained on something related to the ride now, it's probably being done to ensure as quick and smooth practical training process when the ride is ready. That will mean there's a speedy turnover from ride being ready to opening.