Yea one side nearly shut down after a drive tire ripped, but both managed to make it through a full day
Get a German coaster
![Squinting face with tongue :stuck_out_tongue_closed_eyes: 😝](https://cdn.jsdelivr.net/joypixels/assets/8.0/png/unicode/64/1f61d.png)
Yea one side nearly shut down after a drive tire ripped, but both managed to make it through a full day
Most likely yes, but there isn't much track so most of it is ground level work.But they have to put the station in, the active components, the water pumps and filtration - and then comes the train. I guess 2-3 months until everything is in place to start testing. And then I already see the sign "Due to late parts from Europe..."