GuyWithAStick
Captain Basic
Yay! My first contest!
So the rules are simple:
-It must be a shuttle coaster. So there must be a track ending point so the train can go backwards.
-Any CS/CTR is allowed. Just make sure it can be downloaded. So if you make your own, you must put it up for download.
-You must include pictures(min of 10) and a POV. Any extra pictures and or videos will receive extra points.
-List manufacturer(based on track type), height, top speed, intensity rating, excitement rating, inversions(if any), custom scenery/rides, and length of track.
-You MUST HAVE A NAME(art or sign is optional)!
You will be scored on the following out of 10:
-Speed
-Intensity
-Theming/scenery
-Pictures(one picture is half a point)
-Video(s)(Extra videos receive up to 5 extra points depending on quality)
-Layout
-Elements
-Transitions
-Creativity
-Originality(Boomerangs and other recreations will receive lower scores)
You will then be judged on an average score. Highest score wins.
Your pictures must be of all elements(one picture of each), total layout, station, queue, and trains
Signups close on 7/20/14
Final products due 8/10/14
Happy building!
So the rules are simple:
-It must be a shuttle coaster. So there must be a track ending point so the train can go backwards.
-Any CS/CTR is allowed. Just make sure it can be downloaded. So if you make your own, you must put it up for download.
-You must include pictures(min of 10) and a POV. Any extra pictures and or videos will receive extra points.
-List manufacturer(based on track type), height, top speed, intensity rating, excitement rating, inversions(if any), custom scenery/rides, and length of track.
-You MUST HAVE A NAME(art or sign is optional)!
You will be scored on the following out of 10:
-Speed
-Intensity
-Theming/scenery
-Pictures(one picture is half a point)
-Video(s)(Extra videos receive up to 5 extra points depending on quality)
-Layout
-Elements
-Transitions
-Creativity
-Originality(Boomerangs and other recreations will receive lower scores)
You will then be judged on an average score. Highest score wins.
Your pictures must be of all elements(one picture of each), total layout, station, queue, and trains
Signups close on 7/20/14
Final products due 8/10/14
Happy building!