Niles
Giga Poster
Here is an update on the Viking area.
Drakons station area has had loads more foundations poured for it with more for the ride going in also.



Here is a look at the toilet block.

Cobras retheme is underway and the park have moved Cobra topiary to the gardens.


The large central building had started to have walls and roofs added.

Finally a wall has gone in i think to level the area with earth separating the 2026 and 2027 areas.



Looking good so far, excited to see track for Drakon when it arrives.
Source below:
Drakons station area has had loads more foundations poured for it with more for the ride going in also.



Here is a look at the toilet block.

Cobras retheme is underway and the park have moved Cobra topiary to the gardens.


The large central building had started to have walls and roofs added.

Finally a wall has gone in i think to level the area with earth separating the 2026 and 2027 areas.



Looking good so far, excited to see track for Drakon when it arrives.
Source below: