Throttling the lift hill is always a possibility (and an easy way to expedite dispatch times). I don't think they'll intend to use the MCBR to slow the train; but you could still use it as a block to allow the next train to dispatch. Even if they were to operate three trains and continue letting one train run the circuit (as they currently do now), having three trains would still peel off 5-10 seconds of dispatch so that you have a train ready to go the second the previous train hits the final brake run.I just really hope it doesn’t slow it down too much when they start using it. Although, I think that CP has the capability to cook through dispatches and stuff. They do really well at dispatching the trains on rides like Raptor and Gatekeeper. Especially Raptor. Do you think they could slow down the speed of the chain lift so that way they don’t have to trim it on the mcbr? So that way the time it takes it to get to the mcbr is longer which gives them a bit more time to load and dispatch trains. Because I felt like the ride is gonna be that much better when the mcbr is completely off