To explain the images a bit more:
Work continues on the main hotel building on the left; and the concrete base of the central hotel room tower in the middle appears complete - the wooden blocks on top could be marking the location for the foundations of the tube rooms.
Should be a great location with the launches right in front of you and coaster flying through underneath the rooms.
A new facade wall continuing on from the fake white building front behind the hotel restaurant has been erected. The blue tarpaulins show that theming work has begun on that section.
Plus new metal theming elements have been added to the top of the black towers at the far back.
F.L.Y.ing support? Presumably the footer will be in the yet to built foundations for the hotel entrance/lobby.
Also a clear look at the black frame for the roof of the hotel restaurant in the background - with some very close F.L.Y. interaction above.
The banking on the final curve down below into the brake run looks promising.
On PhantaFriends.de PHL-Marcus has drawn the hotel structures.
And with the speculated positions of the hotel room towers.