What's new

Lotte World Adventure | Busan - South Korea | Theme Park | 2022

Y. Kim

Mega Poster
June 14 update

ALL PHOTOS Taken by me. Please write source when re-distributing



Today I visited there with subway line.(Donghae line Osiria Station)
.
Picture taken at Lotte Outlet next to the park constructed.
First Impression as soon as I take off

Entrance Area-Almost same as concept of Legacy Entertainment. Impressed.

Parking lot. So big
.
Shot of Blue Fire mirror(Giant Digger)
Track completed, and will soon start testing

Station. An ax on the roof-Great themework

Rock tumbler( Zamperla giant frisbee)
Also an elaborate wooden theming.

That green building is a Carousel themed to farm animals (cows,sheeps,pigs etc).
But that log flume is still assembling tracks.
Log flume incomplete, and family coaster track is completed on the right upward (already testing)

Pulsar clone (Water Coaster)
Themed to dragon nest,,, but not this dragon
(Draken)
but...This sleeping dragon

A column of Pulsar clone and a Skyline Luge opening in July. Found a pulsar train covered. But still no water filled.

A family ride with Lottie (mascot of Lotte World) sitting in centre.


Castle&Coaster
Impressed with sheer size of castle.

Coasters and midways. On the left and back, there are planty of lands for future expansion.

A mall expansion is completed, now opened. Restaurants and shops and parking lot.

Concept from Legacy entertaiment
Full shot

View from train station

And, subway station 5 min walk from the patk.

Almost all works for the ride is completed, and some rides are testing. Interior works are now progressing. and some buildings are already in use.

I hope the park opens safely and well. And I will post trip report soonly after it opens.

Park scheduled to open in August,2021 and final work is progressing.
 
Last edited:

Y. Kim

Mega Poster
A drone clip of the park and skyline luge.
Now, swing ride with honeybee and Swan Lake is completed and testing, Rock Tumbler (Zamperla swing ride) will start testing today, Blue Fire will have its track completed on early July due to road construction.

Skyline Luge is scheduled to open in early July, and the park is on the midst of September. Expecting huge crowd, I think I can have chance to visit on mid-October.
 

Y. Kim

Mega Poster
1627369391.png
Official entrance sign * not main entrance. Side entrance at the mall side.
"Lotte World Adventure Busan;Magic Forest"
Font is same, name changed a bit.

source:

Rumored to open in September 10th, 2021. One worker at Lotte World wrote on internet community about opening day. Maybe I'll have the chance to go on late Sept (in Chuseok nighttime) or mid October.
 

Attachments

  • 1627369391.png
    1627369391.png
    404.8 KB · Views: 13
Last edited:

Y. Kim

Mega Poster
Screenshot_20210814-145021_Chrome.jpgFound a promo that if you use Lotte Waterpark at Gimhae, the secret discount coupon will be provided in September. Which implies possibility for September opening.
Rumors say opening date might be Sept 16 or 30.
Other rumors say some ride's core part isn't installed (maybe "engine") some bigger rides except for Rock Tumbler can be delayed.

Giant Digger's testing is scheduled on August, but still no train can be seen.
Now staff training is under way, and parking lot and main plaza is completed and can be seen light on at night.

Planning to get a 1st season pass for this park, as Seoul Lotteworld provides 20% discount for people living nearby. (KRW 220000-》176000)
 

Y. Kim

Mega Poster
From:

Almost complete! All ride's tracks are complete . Some flats under way.

Blue Fire has just 2 trains (approx. 800 pph) not 3 nor 5 :( Still got impressed with Blue Fire's land sides are full of rocks. And hope that the flume is 8 seater (2 peopleX4 rows) instead of normal 4.

Seeing the quality, great theming can be anticipated.
Opening keeps delaying... Now expected Sept 26 or 30 instead of Sep 16. But major coasters have no sign of testing.
Many rides are pretty compactly constructed.

Still hoping for great experience.
But when Covid measurement is still PHASE 4, opening would be delayed.Screenshot_20210829-230041_YouTube.jpgScreenshot_20210829-230623_YouTube.jpgScreenshot_20210829-230633_YouTube.jpgScreenshot_20210829-230647_YouTube.jpgScreenshot_20210829-230711_YouTube.jpgScreenshot_20210829-231156_YouTube.jpgScreenshot_20210829-230826_YouTube.jpgScreenshot_20210829-230801_YouTube.jpgScreenshot_20210829-230751_YouTube.jpgScreenshot_20210829-231304_YouTube.jpgScreenshot_20210829-231253_YouTube.jpgScreenshot_20210829-231227_YouTube.jpgScreenshot_20210829-231219_YouTube.jpgScreenshot_20210829-231316_YouTube.jpgScreenshot_20210829-231423_YouTube.jpgScreenshot_20210829-231432_YouTube.jpgScreenshot_20210829-231651_YouTube.jpgScreenshot_20210829-231647_YouTube.jpgScreenshot_20210829-231554_YouTube.jpgScreenshot_20210829-231500_YouTube.jpgScreenshot_20210829-231657_YouTube.jpg
 

Y. Kim

Mega Poster
Rumors in Lotte Outlet workers say that it's delayed in December:( Other worker in local community say the "important part, or engine" of 2 major coasters are delayed due to issue of manufacturer, and will be shipped in November to December.

Busan city has no idea about opening day, just repeating that it's delayed. And others tried group reservation in October, but Lotte rejected it.

Korean post about opening day.
 
Last edited:

emoo

Hyper Poster
I'm still glad that South Korea is getting some new investments after all this time. It helps reinvigorate the urge to finally visit. Thanks for the updates.
 

Y. Kim

Mega Poster
More updates from inside. Path construction under way. According to my school teacher, she called Lotte World about opening, no reservation is available until this year. Safety of the rides are the 1st priority so I'd wait until it opens perfectly.
1631781801.png1631781801 (1).png1631781801 (4).png
That luge tower behind the castle is a bit annoying, still the castle is great.
1631781801 (7).png1631781801 (6).png1631781801 (10).png1631781801 (9).png
Magical Cookie Train roller coaster station.Looks like Magicpass is available.(Upcharge Fastpass or normal fastpass 3 per person can use)
1631781801 (8).png
.Source https://m.dcinside.com/board/amusementpark/37192
 

Y. Kim

Mega Poster
OFFICIALLY DELAYED TO FEB. 25th 2022.
(according to news and document by Lotte)
1632545882212.jpg

OFFICIAL

Feb 18th- Pre-Open
Feb 25th- Open to public

Also saying there will be no more delay.

https://n.news.naver.com/article/082/0001120636
(Korean news article - see with translation.)

Reasons are
1. Ride installation delayed
2. Local government ordered more works needed, and didn't allowed opening.
3. Not enough testing or soft opening.
4. Covid 19 confirmed cases are still 2000+, so to prevent infection.
5. Traffic policy required.

Last weekend's view from Luge. Waited 60 min per ride due to Chuseok Holiday.

20210922_173211.jpg20210922_172941.jpg20210922_173132.jpg20210922_172931.jpg20210922_172928.jpg20210922_172316.jpg20210922_162810.jpg

Ride Queue photo of Rock Tumbler and Giant Digger. Source ; https://m.blog.naver.com/seogaks/222515516335?view=img_11
Screenshot_20210925-083431_Chrome.jpgScreenshot_20210925-083435_Chrome.jpgScreenshot_20210925-083443_Chrome.jpgScreenshot_20210925-083448_Chrome.jpgScreenshot_20210925-083510_Chrome.jpgScreenshot_20210925-083513_Chrome.jpg
 
Last edited:
Top