    Ah, right. Thanks @GuyWithAStick! I knew it was cold in America at the moment, but I didn't know it was that cold and snowing! I thought it was about 35 degrees Fahrenheit at the minute!
     
  2. Aaron Smith

    Aaron Smith Member

    Likes Received:
    15
    Trophy Points:
    23
    Best Coaster:
    Steel Vengeance
    Best Park:
    Cedar Point
    I could have swore either Tony or someone else said testing was going to start once the weather started to warm up. I'm also pretty sure I heard in an interview that the trains are set to arrive at CP in either March or early April.
     
    Jaiden M. and Matt N like this.
  3. Hyde

    Hyde I Lied About My Age! Staff Member Moderator Social Media Team

    Likes Received:
    1,216
    Trophy Points:
    283
    Best Coaster:
    Steel Vengeance
    Best Park:
    Silver Dollar City
    Coaster Count:
    194
    Testing won't start until it warms up - most likely March.
     
    Matt N likes this.
  4. Mack

    Mack Well-Known Member

    Likes Received:
    105
    Trophy Points:
    203
    Best Coaster:
    El Toro
    Best Park:
    SFMM
    Coaster Count:
    369
    Usually CP is very, very open & publicizing about construction once they've announced it. They even announced MF's first pull-through (where a crane pulls the train slowly through the layout)
     
    Matt N likes this.
  5. CoasterMac305

    CoasterMac305 Well-Known Member

    Likes Received:
    255
    Trophy Points:
    123
    Best Coaster:
    Steel Vengeance
    Best Park:
    Cedar Point
    Coaster Count:
    309
    From a video Cedar Point posted in November, testing won't start till around April.
     
  6. Pear

    Pear Well-Known Member

    Likes Received:
    1,674
    Trophy Points:
    123
    Best Coaster:
    Steel Vengeance
    Best Park:
    Phantasialand
    Coaster Count:
    340
  7. Matt N

    Matt N Well-Known Member

    Likes Received:
    397
    Trophy Points:
    83
    Best Coaster:
    Mako
    Best Park:
    Alton Towers
    Coaster Count:
    56
    Oh wow. Oh wow. Oh wow.
     
  8. Jarrett

    Jarrett Most Obnoxious Member 2016 CF Award Winner 2016

    Likes Received:
    252
    Trophy Points:
    243
    Best Coaster:
    Steel Vengeance
    Best Park:
    Fiesta Texas
    Coaster Count:
    341
    That sunset + My favorite place to photograph this coaster + Icy lake = <3

    Do we know what kind of work is being done now? I thought if RMC's crews left that they'd have all the hardware installed as well but I don't remember hearing anything about brakes or lift chains or anything. Or does Velocity have people that does that for them?
     
    Matt N likes this.
  9. Antinos

    Antinos Well-Known Member

    Likes Received:
    476
    Trophy Points:
    253
    Best Coaster:
    Steel Vengeance
    Best Park:
    Dollywood
    Coaster Count:
    399
    Probably electrical. Also did the park ever disclose who was actually constructing the ride? The past three (at least) rides were constructed by Adena - maybe they're completing the tasks such as lift chain and brakes installation?
     
  10. Hyde

    Hyde I Lied About My Age! Staff Member Moderator Social Media Team

    Likes Received:
    1,216
    Trophy Points:
    283
    Best Coaster:
    Steel Vengeance
    Best Park:
    Silver Dollar City
    Coaster Count:
    194
    Indeed - work right now for the cold season is for electrical wiring, system wiring, and brakes installation. Irvine Ondrey is doing the systems work, and hasn't been on-site yet to the best of my knowledge, so I imagine the work is laying any new conduit that would be needed for electrical, and wiring while they wait for systems and brakes to be installed.
     
  11. Hixee

    Hixee Flojector Staff Member Moderator CF Award Winner 2016

    Likes Received:
    2,159
    Trophy Points:
    438
    Best Coaster:
    Lightning Rod
    Best Park:
    Phantasialand
    Coaster Count:
    538
    On top of what others have said, also don't forget that after the electrics are all installed a lot of testing and commissioning of the sensors and controls has to be done well in advance of a train being sent round the track.

    You don't install the sensors that control the speed of the ride (MCBR, final brake runs, etc) and then just send a train round. You do checks on their feedback and the system responses and interlocks, then you think about sending a train round.

    Often why this phase seems to take the longest, and why often (not always) testing and opening can happen in reasonably quick succession.
     
    Pokemaniac likes this.
  12. Hyde

    Hyde I Lied About My Age! Staff Member Moderator Social Media Team

    Likes Received:
    1,216
    Trophy Points:
    283
    Best Coaster:
    Steel Vengeance
    Best Park:
    Silver Dollar City
    Coaster Count:
    194
    An additional wintry scene from earlier in December.
     
    Sneaky, Zek_Teh_Kek, Matt N and 3 others like this.
  13. Hyde

    Hyde I Lied About My Age! Staff Member Moderator Social Media Team

    Likes Received:
    1,216
    Trophy Points:
    283
    Best Coaster:
    Steel Vengeance
    Best Park:
    Silver Dollar City
    Coaster Count:
    194
    Some new views of Steel Vengeance from the CP Snapchat. The view from under the outter-bank is especially great!

    IMG_1482.jpg IMG_1485.jpg IMG_1484.jpg IMG_1483.jpg
     
    Howie, Sneaky, Matt N and 1 other person like this.
  14. Pear

    Pear Well-Known Member

    Likes Received:
    1,674
    Trophy Points:
    123
    Best Coaster:
    Steel Vengeance
    Best Park:
    Phantasialand
    Coaster Count:
    340
  15. Mysterious Sue

    Mysterious Sue Well-Known Member

    Likes Received:
    678
    Trophy Points:
    183
    Best Coaster:
    Schwur des Kärnan
    Best Park:
    Phantasialand
    Coaster Count:
    852
    Cedar Point is savage af. Still not over Mystic Mine Ride.
     
    Aaron Smith likes this.
  16. Aaron Smith

    Aaron Smith Member

    Likes Received:
    15
    Trophy Points:
    23
    Best Coaster:
    Steel Vengeance
    Best Park:
    Cedar Point
    I hadn't been on Mine Ride for at least 10 years until "Mystic Mine Ride" last fall. I was salty over it for at least an hour.
     
    Mysterious Sue likes this.
  17. Hyde

    Hyde I Lied About My Age! Staff Member Moderator Social Media Team

    Likes Received:
    1,216
    Trophy Points:
    283
    Best Coaster:
    Steel Vengeance
    Best Park:
    Silver Dollar City
    Coaster Count:
    194
    Some additional wintry views:



     

    Attached Files:

    Jaiden M., Hixee and Zek_Teh_Kek like this.
  18. Hixee

    Hixee Flojector Staff Member Moderator CF Award Winner 2016

    Likes Received:
    2,159
    Trophy Points:
    438
    Best Coaster:
    Lightning Rod
    Best Park:
    Phantasialand
    Coaster Count:
    538
    I am buzzing for this now! I've pretty much confirmed a trip, so I can't wait to get on this in August!
     
    ASteelersMidget and tomahawk like this.
  19. Zek_Teh_Kek

    Zek_Teh_Kek Well-Known Member

    Likes Received:
    145
    Trophy Points:
    53
    Best Coaster:
    Steel Vengeance
    Best Park:
    Cedar Point
    Coaster Count:
    72
    It's the final countdown! 100 more days until I can (possibly) ride this beast!
     
  20. Jaiden M.

    Jaiden M. Active Member

    Likes Received:
    45
    Trophy Points:
    38
    Best Coaster:
    Twisted Colossus
    Best Park:
    Six Flags Magic Mtn.
    Coaster Count:
    65
    195 days till my trip
     

Share This Page